L46A1 Mast Section Operation of Tower Machine Distribution Cabinet

05-11-2019

1. When switching shore power, the power switches of the shore screen should be cut off first, and then the correctness of the wiring and phase sequence should be checked. After confirming the correctness, the conversion of shore power can only be implemented.


2. The Switchgear of the tower machine should be cleaned and maintained regularly so that the equipment is always in good working condition.


3. During normal operation, the switches on the distribution board should be connected to ensure that the generator can be started at any time and can be put into use at any time when it is required.


4. In order to ensure the normal operation of the equipment, no irrelevant personnel must turn the switch on the board.


5. When the generator is working and the engineer is operating the power distribution board, he should concentrate on his thoughts and exercise caution to prevent accidents from happening. If not, he will be held accountable for personal accidents.