1. Always check all wires and cables for damage, and bandage or replace damaged parts in a timely manner.


2 When the motor is overheated, it must be parked in time. After troubleshooting, it must continue to operate. The motor bearing must be lubricated well.


3 All control boxes, distribution boxes, etc. should be kept clean, and dust on electrical equipment should be cleaned in a timely manner.


4 The contact of the trip switch on each safety device must be reliable, and the contact arc pit should be polished in time.


5 The protective ground resistance should be measured twice a year to ensure that it does not exceed 4 Ω.