256HC Mast Section Maintenance of Tower lifting equipment

30-10-2019

1. Maintenance work before the tower machine work class:
(1) Removal of obstacles on the track(limited to orbital towers);
(2) marking obstacles within the radius of rotation of the cantilever;
(3) check whether the braking system is reliable;
(4) to check the lubricating oil of each reducer;
(5) check whether the bolt connection is loose and tighten it in time;
(6) Check the safety devices, must be complete and effective;
(7) Check the cable for damage and bandage the damaged area in time.
2. Maintenance work in the tower work class:
(1) Listen carefully to the operation of major working organizations;
(2) Pay attention to the sound of fine listening Motors, brakes, and contactors;
(3) When the tower machine stops, carefully inspect the temperature rise of the bearings, motors, braking electromagnets, and resistors;
(4) When the tower machine stops, leave to check the braking system.
3. Maintenance work after the tower machine work class:
(1) cleaning the cab;
(2) Cut off the power and lock the doors and windows of the cab;
(3) The tower crane driver carefully fills in the shift record.

256HC Mast Section 256HC mast section the specification can suitable this situaton no problem

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy