154HC Mast Section What materials should be submitted if the tower crane certificate requests extension review
1. Original or copy of id card.
154HC Mast Section
http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane
2. Pass the adjournment for confirmation.
3. Guarantee education guidance, training and training of heng Ming or continuous education certificate.
4. Examine the rest of the information required to submit for processing by the dazed trigger.
The results of the extended review shall be divided in one of the following categories:
1. Above the age specified for the operation of the tower crane.
2. Tall, short, fat, thin, healthy condition is no longer suitable for a corresponding special job position.
3. Responsible for the production of safety incidents.
4. More than 3 times of illegal operation records within two years.
5. Do not participate in the year without risk education training or adhering to the education?
154HC Mast Section
http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane
6. Review other matters stipulated in the trigger issue permit.