154HC Mast Section Summary of 10 measures to prevent tower crane accidents

16-12-2019

1. Establish technical files of tower crane unit:



154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane154HC Mast Section



The equipment technical file is an important basic data of equipment management and an effective means to comprehensively record the equipment operation, maintenance, repair, oil replacement, operator changes and the replacement of main spare parts. The user shall establish a technical file for each tower crane and record the above contents in time.




2. Strengthen the management of tower crane installation and disassembly:




Accidents in the process of tower crane installation and disassembly account for a large proportion of tower crane accidents, so the key to ensure the safety of tower crane is to manage the installation and disassembly of tower crane.




3. Adhere to the system of work with certificate to ensure safe operation and command:




The operators and commanders of tower crane must receive special safety technical training, pass the examination and obtain the operation certificate before going to work. It is strictly prohibited for non operators, non professional commanders and undocumented personnel to work. This is the most critical and fundamental condition in the use process. Strengthen the management of tower crane operation records.




4. Make equipment operation records




Tower crane operators shall carefully fill in the equipment operation records to ensure that the information filled in is timely, true and accurate. Strengthen daily inspection and maintenance. Tower crane operators shall carefully carry out daily inspection on the tower crane according to the provisions of the equipment management system, comprehensively and carefully inspect the key parts and important devices, carefully and carefully inspect them, and deal with the problems found in a timely manner.




5. Do a good job in tower crane maintenance



154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane

154HC Mast Section

Strictly implement the maintenance system and do a good job of tower crane maintenance. It is necessary to adhere to the regular maintenance system and scheduled maintenance system, and to maintain the tower crane in accordance with the maintenance and repair procedures, so that the equipment will not be damaged.




6. Operate in strict accordance with tower crane parameters




The operation shall be carried out in strict accordance with the parameters indicated in the operating instructions of the tower crane. It is strictly prohibited to use the crane in excess of the limit and overload.




7. Purchase of tower crane




By strengthening the management of tower crane purchase, the poor quality equipment shall not be allowed to enter the construction enterprise and construction site from the source, so as to ensure the safety and health of employees' lives and properties and avoid adverse consequences and losses. When purchasing the tower crane, it is necessary to purchase the corresponding model of the tower crane from the manufacturer with the production license issued by the competent government department. When purchasing tower cranes, we need to compare the three goods, choose the best among the best, and ensure that the qualified tower cranes can be purchased safely and safely. When the tower crane is purchased for acceptance, the acceptance shall be well controlled.




8. Seriously implement the elimination system



154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane

154HC Mast Section

Conscientiously implement the regulations of the competent government departments such as the state and the industry on the elimination and renewal of such equipment. All kinds of tower cranes that are explicitly eliminated by the state and governments at all levels must be stopped from use.




9. Whether the safety device is effective




Always check the effectiveness of safety devices such as tower crane moment limiter. Strengthen the purchase management of tower crane products, and strictly prevent the fake and inferior tower crane from entering the construction enterprise and construction site.




10. Education and training




Strengthen the education and training of tower crane operation, command and management personnel. Education and training is an important basic work of equipment management. It is the most basic and fundamental measure to ensure the use, disassembly and management safety of tower crane.




Due to the diversity of employment forms of construction enterprises under the current market economy, especially the emergence of a large number of migrant workers and labor workers, their technical quality and safety skills are uneven and generally low, so the contradiction between education and training is more prominent and urgent. The construction enterprise and its project department shall attach great importance to the education and training of tower crane operation, command and disassembly personnel, and form a system to ensure that all personnel can meet the requirements of technology and safety management system.

154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane

154HC Mast Section

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy