154HC Mast Section Is the tower crane still required to apply to the supervisor for inspection during the later installation and removal

17-12-2019

Generally, there is no need to apply for special inspection procedures, but only to apply for inspection (lifting machinery) removal application. Generally, there is a special disassembly (installation) scheme and application form (the application form is generally provided by the local safety supervision department). What is the procedure inspection application form for tower crane installation that needs to be submitted to the supervisor? At present, the use and management of special equipment on site is under the jurisdiction of the construction administrative department. Generally, each area has a construction safety supervision station to manage. Therefore, the requirements of each region are inconsistent and there is no unified standard. You need to consult the local safety supervision station.


154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane154HC Mast Section





Generally speaking, the project department supervisor needs to review the contents




1. Whether the tower crane meets the specified standards: special equipment production license, lifting equipment installation qualification of the Ministry of construction. Tower crane production certificate. Registration certificate of ex factory supervision and inspection certificate of Technical Supervision Bureau, etc.


2. Acceptance procedures for concealed works of tower crane foundation.


3. Installation and disassembly plan


4. Tower crane maintenance records.


5. Installation self inspection record



154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane

154HC Mast Section


Finally, report to the inspection station for site acceptance, report to the tower crane foundation layout plan, concrete pouring construction record, foundation construction report materials, including the plan and profile. The size and relevant position of each base shall be marked on the plan; the section shall show the reinforcement, concrete strength, base height and base treatment method (generally written as plain soil compaction), as well as the embedded size of foot bolts.



154HC Mast Section:

http://www.towercranesupply.com/product/154hc-mast-section-liebherr-tower-crane

154HC Mast Section


Required accessories: list of tower crane, record registration certificate, inspection certificate, construction crane registration form, acceptance inspection report, disassembly plan, jacking plan, anchoring plan, safety technical disclosure, grounding test record, installation and commissioning record, foundation acceptance form, installation acceptance form, anchorage acceptance form, inspection record, hoisting equipment acceptance form, operator registration form, special Work license, work safety agreement, management system of mechanical installation and use, enterprise qualification certificate of installation unit, etc


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy