132HC Mast SectionTower Crane Operation "four meeting" that will use, will maintain, will check, will remove the failure

11-09-2020

Tower Crane Operation "four will" that will use, will maintain, will check, will remove the failure. Be Able to use: in the lease, concentrate on, carry out the operating rules, in the practice of constant exploration and accumulation of experience, give full play to the potential of equipment, and prevent the occurrence of personal and equipment accidents. 

132HC Mast Section

http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane

132HC Mast Section

Will maintain: DO A good job of regular maintenance and routine maintenance, in accordance with the lubrication requirements of various parts, do qualitative, quantitative, timing, fixed-point Lubrication. WILL CHECK: earnestly carry out pre-shift inspection and test run, to ensure the safety and reliability of safety devices, brake devices, controllers, etc. . In operation, carefully observe and judge the operation of the equipment from the sound, abnormal should be stopped for inspection, and contract maintenance personnel to find out the cause. Troubleshooting: the General Tower Crane Mechanical and electrical failure should be self-removal, the larger failure of the contract maintenance personnel together to remove. In case of personnel and equipment accident, keep the scene and report to the leader immediately.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy