At this stage, the construction scale is expanding constantly. When there are two or more tower cranes working on the construction site or adjacent construction sites, and the radius of tower crane operation overlaps, reliable anti-collision measures must be taken to ensure the construction safety.


132HC Mast Section:

http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane132HC Mast Section




(1) the distance between any part of walking tower crane (including lifting objects) shall not be less than 5m; for fixed tower crane, the distance between the end of low tower arm and high tower body shall not be less than 2m, and the vertical distance between high tower hook and low tower shall not be less than 2m. Prevent the interference and collision between the boom and balance arm of the adjacent tower crane and the tower body, tower cap and tie rod.




(2) organizational measures shall be taken to specify the slewing and walking routes of the tower crane, and strict disclosure shall be made to the tower crane commander and the driver, which shall be supervised and implemented by special personnel. It is strictly prohibited that adjacent tower cranes operate in the same construction area in the opposite direction and cross operation, so as to prevent the winding of lifting wire ropes.


132HC Mast Section:

http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane

132HC Mast Section


(3) by using technical means, shorten the boom, raise (lower) the tower body, and set the travel, rotation, superelevation limit, etc. to ensure the safety of anti-collision.

132HC Mast Section:

http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane

132HC Mast Section

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy