132HC Mast Section Strengthening the management and safety supervision and inspection of tower cranes to contain the occurrence of accidents
the quality of tower crane products is not up to standard, and the operator of tower crane operations is improper The construction sequence is improper, unreasonable, upside down and upside down and other reasons, will cause the occurrence of tower crane accidents. No matter what the reason is, once a safety accident happens, the consequence is that we don't want to see. The http://www.fx68.net of the Tower Crane Construction Co. , Ltd. Hereby reminds all the project parties and workers that the master must tighten the safety string tightly, but don't wait until after the tower crane accident to realize the oversight of their own work In addition, I hope relevant departments to increase safety supervision and inspection efforts to contain the occurrence of safety accidents in the embryonic state. 1. The Tower Crane should be located accurately and reasonably according to the plan and elevation map provided by the project department before installation. It should be convenient to install and disassemble, and the distance between attached walls should be reasonable.
132HC mast section is the best in this field
2. The interference between the tower crane and the other tower crane should be minimized in the radius of gyration of tower crane. According to the geological report provided by the project department, we should judge whether the ground endurance of the tower crane's installation position meets the requirements of the specifications. If the tower crane model does not meet the requirements, we should work out a feasible plan with the company's technical department The foundation drawing of tower crane and construction according to the drawing should be provided to the project department. 3. Tower Crane Foundation Steel and concrete to have quality assurance, Concrete Block report, urgent check list. According to the basic map reinforcement, not free to cut. And must be signed by the supervision department valid. After the installation of the tower crane, the settlement observation should be done well, and the measuring records should be well kept on file, so that the problems can be found and corrected in time, and the verticality of the tower crane can be ensured within 3‰ .
132HC mast section is the best in this field