132HC Mast Section how to choose the Mobile crane equipment for the installation and disassembly of tower cranes.

11-09-2020

Mobile crane includes truck cranes and crawler mounted cranes. When choosing auxiliary lifting equipment, the lifting height, range and lifting weight should be considered comprehensively so as to satisfy the request of tower crane during installation and disassembly. The longer the crane arm extends, the greater the lifting height and the smaller the lifting weight, and the lifting weight decreases accordingly.

132HC Mast Section

http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane

132HC Mast Section Before the erection and dismantling of the tower crane, the advantageous working position of the auxiliary lifting equipment should be selected according to the installation and dismantling site of the tower crane. When the tower crane is dismantled, the jack-up tower crane has the premise that the Ying County self-descending section, so that the tower crane is lowered to the lowest position, and then the auxiliary lifting equipment is selected to dismantle. The factory is Shandong Tower Crane Production Key enterprises, R & D design, production and sales as one. Can produce a variety of models, to provide the latest models of all types of tower crane prices. The Enterprise has the domestic advanced construction machinery production line, the precision inspection equipment, may guarantee the quality reliable safety.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy