132HC Mast Section Difference between independent installation and attached installation of tower crane

30-03-2020

Generally, the tower crane installation will be carried out in two ways: independent installation and attached installation. Next, the editor of the tower crane factory and you will discuss the difference between independent installation and attached installation of the lower tower crane.



http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane

132HC Mast Section

1. Independent installation




The truck crane is mainly used. After the bottom beam is installed and fastened, install the foundation section, support section and standard section in turn, then install the outer jacket swivel part, then install the tower cap, rear arm, finally install the lifting arm, and finally install the remaining counterweight. After the above installation is in place (after the installation of the truck crane), it is required to jack up the joint to an independent height.




2. Attachment installation




As the work after the completion of the above-mentioned crane installation, the only additional work is to install the anchoring attachment device first, and then lift the tower crane section by section through its own jacking system until the required height.

http://www.towercranesupply.com/product/132hc-mast-section-liebherr-tower-crane

132HC Mast

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy